Both dates, e.g. Production and delivery dates as well as costs such as project or material costs can be exchanged via the interface with BIM systems.

Time and Cost

Dates and costs may never be lost during a project. This is why, in erpbos®, these factors are at the very least under control during the entire project phase and can detect deviations at any time.

Feedback

Throughout the project process, the CAD programs and the MES systems communicate with erpbos®. The ERP system regularly exchanges production status, assembly progress, costs and deadlines with the CAD program.

Complete product life cycle

With erpbos® the complete product life cycle is documented. Even after several years, you can track when the elements were produced, which materials they contain and where they were installed in the building.